Showing posts with label Road Closures. Show all posts
Showing posts with label Road Closures. Show all posts

Tuesday, March 15, 2016

St Patrick's Day Road Closures and Diversions

The St Patrick's Day Parade takes place in Dublin City this Thursday from midday.

The parade will begin at Parnell Square North before making its way onto O'Conell St via Parnell Sq East. From there it will travel south over O'Connell Bridge to Westmoreland St and College Green before heading towards Christchurch. It will then turn left on Nicholas St and finish just past St Patrick's Cathedral.

A number of closures will be in place to facilitate the event. Western Way will be closed from 7pm on Wednesday until 3pm on Thursday. On Thursday, the following closures will be in place from 5am to 5pm:

- Mountjoy St
- Mountjoy Sq Middle
- Palmerstown Place
- Wellington St
- St Mary's Place North
- Granby Row
- Parnell Sq North
- Parnell Sq East
- Cavendish Row
- O'Connell St
- Westmoreland St
- College Green
- Dame St
- Lord Edward St
- Christchurch Place
- Nicholas St
- Patrick St
- New St South
- New Market
- Clanbrassil St Lwr.

Traffic on North Quays will be diverted via Church St, Constitution Hill, North Circular Road, Portland Row and Amiens St

Inbound traffic heading south on North Wall Quay will be diverted via City Quay, Lombard St, Westland Row, Merrion Sq North, Mount St Lwr and Haddington Rd. Traffic travelling west on North Wall Quay will be diverted via George's Quay, Beresford Place, Gardiner St, NCR, Infirmary Rd and Parkgate St.

Dublin Bus are operating a number of diversions to their routes due to the festival. Details can be found on www.dublinbus.ie

LUAS services will not operate on St Patrick's Day due to strike action.

Wednesday, November 11, 2015

'Run In The Dark' rolling road closures this evening.

The Dublin leg of this year's 'Run In The Dark' takes place this evening around the Docklands area to help to fund the Mark Pollock Trust in finding a cure for paralysis. To facilitate this, there will be number of rolling road closures between 8 - 9.30 pm. The main roads affected are:

- Custom House Quay


- East Wall Road


- Sean Moore Road


- Irishtown Road


- Ringsend Road


- Macken St


For full details of how this may affect you, check out:

http://www.runinthedark.org/news/

Tuesday, January 27, 2015

No access to Aungier St from Bishop St from Sunday the 1st of February.

In a bid to reduce traffic conflict at the junction, Dublin City Council will be closing access from Bishop Street onto Aungier Street/Redmond’s Hill from Sunday February 1st 2015.

This is going to cause a lot of confusion for a few days next week as a significant number of cars use the "rat run"

The closure is designed to improve traffic flow along Aungier Street particularly in light of the increased bus traffic in the area due to recent Luas Diversionary works.

The closure will make it safer for both pedestrians and cyclists passing through the junction and improve the environment for local residents by reducing traffic along Bishop Street.

The closure will initially be implemented for a trial period of 6 months with a view to making the closure permanent should it prove successful.

Possible Diversionary Routes for Local Traffic on Bishop’s Street

Bishop Street to Wexford Street:
Traffic can proceed down Peter’s Row, turn right at Whitefriar Place and turn right onto Aungier Street.

Bishop Street to Aungier Street:
Traffic can proceed down Peter’s Row, turn right at Whitefriar Place and turn right or left onto Aungier Street.

Bishop Street to Georges St / Aungier St:
Instead of taking Bishop St, travel along Bride St to Golden Lane and from there take Stephens St Upper to either Georges St or Aungeir St

Bishop Street to Digges Street Upper
Traffic can proceed down Peter’s Row, turn right at Whitefriar Place, turn right onto Aungier Street, and then turn left onto Digges Street Upper

Comments or Observations on the Closure can be forwarded to traffic@dublincity.ie

Saturday, August 23, 2014

No left turn from North Fredrick St to Parnell St for 11 Weeks.

OK so technically it's Cavendish Row not North Frederick St, but lots of people call that little slip of road a few different things. either way 

From Tuesday 26th August there will be no left turn from Cavendish Row to Parnell St for 11 weeks.
For the first week of these works there will be only one lane from Parnell Street onto Parnell Square
From Sunday Evening (24th August) Parnell Street will be reduced to one lane in both directions at Parnell Square West

Friday, August 22, 2014

Closure of Dawson St for the lying in State of the late Taoiseach Albert Reynolds

Due to the lying in state at the Mansion House of the late Taoiseach Albert Reynolds, tomorrow Saturday 23rd August 2014, Dawson Street will close to traffic from 6 PM to 7.20 PM

You can expect delays to traffic coming in from Leeson St  and also around 1 on Sunday when the state funeral of the former Taoiseach takes place in Donnybrook.

All bus routes normally using Dawson Street on Saturday evening will be diverted from Leeson Street (Routes 11, 46a and 145) and Baggot Street (25, 25a, 25b, 37, 38, 38a, 38b, 39, 39a, 70) to Fitzwilliam Street, Merrion Square North, Clare Street, Westland Row, Pearse Street, College Street to Westmoreland Street and back on to normal route.

Routes 14, 15, 15a, 15b, 44, 61 and 140 that normally access Dawson Street from Camden Street Upper will divert straight on Camden Street to Georges Street, Dame Street to Westmoreland Street and back on to normal route.


Thursday, August 14, 2014

IMPORTANT Newlands Cross Diversions

Newlands Cross underpass is closed due to concrete pouring. As a result Belgard Rd and Fonthill Rd are left turn only and there is no right turn from the N7 outbound to the Fonthill Rd.

We are expecting there to be severe delays later, on both the Belgard Rd and Fonthill Rd and also added delays on the N7 inbound and outbound approaching Newlands Cross.

Our best advice for the evening is to avoid Newlands Cross altogether and use the Outer Ring Rd.

Diversions:

To drive form the Fonthill Rd to Belgard Rd or to the  N7 outbound, turn left at Newlands Cross then loop around on the Luas Bridge to the N7 outbound and on to Newlands Cross where you can either turn left onto the Belgard Rd or keep driving straight out on the N7

To get from the Belgard Rd to Fonthill Rd or N7 inbound. Turn left at the Belgard Rd then loop back around at J2 Kingswood, where you can either keep driving straight on or turn left at Newlands Cross onto the Fonthill Rd.

N7 Outbound to Fonthill Rd must also loop back around at J2 Kingswood and turn left at Newlands Cross onto the Fonthill Rd.

Stay tuned to 103.2 FM for updates. 

Wednesday, August 6, 2014

Bray Main St Closure

From Monday the 11th Bray Main st will close in two places for 4 nights.

The two locations are Quinsborough Road to Bray Bridge and St Kevin's Square to Parnell Road. 

There will be a temporary surface following the first two nights when the road will be planed. A traffic management system will be in place during the works and delays should be expected. 
 

Thursday, July 24, 2014

New St Malahide Closure

New Street, Malahide will be closed this Saturday from  6 in the morning until 11 Sunday night for Malahide Festival.

The closure will begin at the junction with Ross Cottages to the junction with Main Street/The Mall.

The alternative route for traffic travelling in the area si:

Traffic travelling from Bissett’s Strand will divert via The Green and St James Terrace to access Main
Street/The Mall areas.

Access to Malahide Marina area will be via Old Street.

Traffic travelling from Malahide Marina will divert via The Green and St. James’ Terrace.

Monday, July 21, 2014

Dundrum and Milltown Delays - Classon Bridge Closed

Classon Bridge by the Dropping Well Pub is closed for works until the 18th of August. Diversions are via Orwell Rd and Dundrum Rd.

This is causing issues along Dundrum Rd from Milltown and along Orwell Park and Orwell Rd.

Friday, May 30, 2014

Women’s Mini Marathon 2014 Road Closures

The following roads will be closed to facilitate the Women’s Mini Marathon on Bank Holiday Monday June 2nd 2014:

Fitzwilliam Street Upper 06.00hrs to 18.00 hrs
Fitzwilliam Place 06.00hrs to 18.00 hrs
Baggot Street Lower 06.00hrs to 18.00 hrs
Fitzwilliam Street Lower 08.00hrs 18.00 hrs
Pembroke Street Upper & Lower 08.00hrs to 18.00 hrs
Merrion Square East 08.00hrs to 18.00 hrs
Merrion Square South 08.00hrs to 18.00 hrs
Merrion Square West 08.00hrs18.00 hrs
Merrion Street Upper 08.00hrs to 18.00 hrs
Hume Street 10.30hrs to 18.00 hrs
Ely Place 10.30hrs to 18.00 hrs
Baggot Street Bridge 13.30hrs to 15.30 hrs
Baggot Street Upper 13.30hrs to 15.30 hrs
Pembroke Road 13.30hrs to 18.00 hrs
Leeson Street Lower 12.00hrs to 17.30 hrs
Leeson Street Bridge 14.30hrs to 17.30 hrs
Adelaide Road 14.30hrs to 17.30 hrs
Nutley Lane 13.30hrs to 16.30 hrs


Dún Laoghaire-Rathdown County Council is also closing of the R138/Stillorgan Road (from Fosters Avenue to Belfield Bridge) on Bank Holiday Monday 2nd June 2014 from 13.30hrs to 16.30hrs

The proposed diversion route for this temporary road closure is via Fosters Avenue and Roebuck Road.

Traffic Management Plan for the event:

Inbound traffic on Rock Road will be diverted via Strand Road, Beach Road, Bath Street, Irishtown Road, Bridge Street, Ringsend Road, Pearse Street and Tara Street.

Inbound traffic on Stillorgan Road will divert via Foster Avenue, Roebuck Road, Clonskeagh Road, Sandford Road, Ranelagh Road, Charlemont Street, Harcourt Road, Camden Street, Camden Street Lower, Wexford Street, Aungier Street, South Great George’s Street, Dame Street, Lord Edward Street, Christchurch Place, Winetavern Street to the quays.

Outbound traffic on College Green wishing to travel south on Stillorgan Road will be diverted via Dame Street. South Great George’s Street, Aungier Street, Wexford Street, Camden Street, Charlotte Way, Harcourt Street, Harcourt Road, Charlemont Street, Ranelagh Road, Sandford Road, Clonskeagh Road, Roebuck Road and Fosters Avenue.

Outbound traffic on Townsend Street wishing to travel south via Merrion Square will be diverted via Pearse Street, Ringsend Road, Bridge Street, Irishtown Road, Pembroke Street, Beach Road, Strand Road to Rock Road.

Pedestrian and local access will be maintained.

Wednesday, May 28, 2014

Traffic Restrictions For @ForbiddenFFest

This shouldn't have a big effect on local traffic as festival goers take public transport to and from the festival. however Bloom will have an impact on the area and this will delay music lovers journeys to the festival. 

Don't drive as there will be ‘no parking available for the public’ at or in the vicinity of the Royal Hospital Kilmainham. Cars will be clamped or removed if parked in the vicinity. 

As the festival is well serviced by Dublin Bus, Luas and Irish rail public transport is the best way to get to and from the event. 

Road Closures

1. Military Road will be closed  from the junction with Johns Road West from 1pm until event is over, and also the junction with Kilmainham Lane/Bow Lane West for the same periods. Some Disabled Access vehicles, and work vehicles seeking access to the East Gate will be facilitated access through this junction, subject to co-ordination of traffic movements with Gardaí in that Sector.

2 Military Road will be available for use by Dublin Bus during all times of the events each day. This will also be available for use by emergency vehicles.

3 Military Road will remain open to all traffic travelling outbound towards St. John’s Road West only, subject to co-ordination of traffic movements with Gardaí.

4 Kilmainham Lane will be restricted to one-way traffic outbound only from 1pm each day during these events. Both road closures will be enforced by Gardaí.


The RHK museum will be open as normal during these events but without parking for persons attending museum. This will have to be monitored by Gardai working in vicinity of the East gate.

Disabled Parking

Cars displaying a disability badge only will be permitted to enter the venue by the East gate.

Pedestrians

Pedestrian access and exit throughout the event via East Gate to Military Road only, while the West Gate will be utilised as the Emergency Access point to venue, but will be opened for pedestrian exit at end of event. Barriers will be erected at the West Gate to ensure the safety of pedestrians exiting the event.

Tickets will be provisionally checked at East gate

Taxis

A “drop and go” system will be in operation for taxis on Johns Road West in the vicinity of Heuston Station and on Kilmainham Lane at junction with Irwin Street. A taxi waiting area will be facilitated along St Johns Road West (Inbound) for passenger pick up or waiting for patrons leaving through the East Gate after the event. There will be no taxi ranks or permitted pick up points on St John’s Road West (Outbound), Con Colbert Road, South Circular Road, Military Road, Kilmainham Lane, Bow Lane West or St Johns Road West (Outbound). No taxi access will be permitted at any time onto Military Road during the event on any day until road closures are lifted.

Luas

The Luas stop on Davitt Road/Suir Road and Heuston Station are the closest Luas stops to the event for patrons entering via the East Gate, and persons will be encouraged to use Luas service in all promotional material.

Emergency Route

The West Gate will act as the dedicated Emergency Route.

Main Car Park

There will be no parking for the public attending concerts in the ground of the RHK. Car parking is available for member’s vehicles at west end of RHK car park, immediately to rear of Kilmainham Station, entering through East Gate.

East Gate Entrance

All authorised vehicles entering the RHK will use this gate i.e. buses and wheelchair. 

All traffic exiting the RHK will leave via the East Gate when safe to do so.

Kilmainham Lane/SCR Junction

For the duration of these events, Kilmainham Lane will be restricted to a one-way traffic flow system, outbound only, with no entry for vehicles from SCR. When implemented this rule will be rigorously enforced for all vehicles, including Gardai, taxis, residents and motor cyclists.

Road Closures after Event:

From approx 10.30pm on both 31st May and 1st June 2014 the following road closures will come into place for the purpose of crowd safety in terms of patrons leaving the RHK concert event.

• St John’s Road West (Outbound) will be closed for all traffic including taxi’s and public transport vehicles, and will divert all traffic onto Heuston Bridge towards Parkgate Street and Conyngham Road. Barriers will be put in place along the central median of St Johns Road West to prevent pedestrian access across inbound carriageway other than at junction of Military Road, which will be controlled by Gardai to permit passage of traffic inbound when necessary.

• Bow Lane West will be closed to all outbound traffic from James Street including taxis and all traffic will be diverted outbound along James Street. This will effectively prevent taxi issues arising within the cordon while patrons are leaving the area.

• South Circular Road (Outbound) will be closed temporarily at junction with Emmet Road, and traffic diverted left onto Emmet Road or right onto Old Kilmainham for duration of closure. Traffic inbound along Emmet Road will not be allowed turn left onto South Circular Road, but diverted inbound towards City Centre.

• South Circular Road (Inbound) will be closed temporarily at junction with Con Colbert Road and there will be no right turns for traffic from junction of N4 inbound towards South Circular Road.

Wednesday, May 14, 2014

Becket Bridge Closures

Samuel Beckett Bridge will close to both pedestrian and vehicular traffic at the following times during the month of May:

Sunday 18th May 2014 14:00 hours until 15:00 hours

Monday 19th May 2014 21:00 hours until Tuesday 20th May 2014 06:00 hours

Tuesday 20th May 2014 21:00 hours until Wednesday 21st May 2014 06:00 hours

Wednesday 21st May 2014 21:00 hours until Thursday 22nd May 2014 06:00 hours

Thursday 22nd May 2014 21:00 hours until Friday 23rd May 2014 06:00 hours

The opening on the 18th May 2014 is required to facilitate the movement of ships on the river while the remaining openings are required in order to facilitate maintenance works on the bridge

Wednesday, May 7, 2014

Giro d’Italia Sunday road Closures in Fingal.

Following our previous post on road closures in Dublin City for the G'iro d'Italia there will also be number of closures in the Fingal area as the race makes its way through.

If you are travelling out to watch the race there will be minimal disruption to public transport. Don;t forget to wear pink!!

Family fun events have been organised in Balbriggan and Malahide for 90 minutes before the cyclists arrive

Stage 3 of the Race will depart from Armagh City at 11.45am on 11th May, cross the border heading towards Dundalk, Castlebellingham and Drogheda and continue along the coast entering Balbriggan at approximately 14.50hrs. It will then pass Skerries, Lusk, Blakes Cross, Swords (Estuary roundabout), Malahide, Portmarnock and enter Dublin City at Baldoyle travelling to Clontarf, Alfie Byrne Road, East Wall Road, 02, North Wall Quay, Custom House Quay, cross the Liffey at Talbot Memorial Bridge, City Quay, Lombard Street, Westland Row, Lincoln Place to the finish line at Merrion Square West at approximately 16:30 hrs.

The following roads in FINGAL will close from approximately 1.30pm to 4.30pm this Sunday the 11th of May:

  • R132 Drogheda Road from Co. Meath to Balbriggan (via Drogheda St., Bridge St., Dublin St., Old Market Green)
  • R127 Skerries Road to Skerries, via Balbriggan Road, Balbriggan St., Thomas Hand St., Dublin Road.
  • R127 to Lusk, via Main St., Dublin Rd.,
  • R127 to Blakes Cross,
  • R132 via Lissenhall M1 interchange to Seatown Roundabout Swords to Estuary Road (via Seatown Industrial Estate) to Old Yellow Walls Road, Yellow Walls Road,
  • To Malahide via R106 Dublin Rd., Main St., The Mall.,
  • To Portmarnock via Coast Road, Strand Road,
  • To Baldoyle via Coast Road R106, Main St., to Dublin Road, via Warrenhouse Road., Baldoyle Road.,
  • To Dublin City via R105 Dublin Road.

Summer Weekend Closures in the Phoenix Park

This always makes us feel that summer is here!

From Friday 9 May 2014 to Sunday 28 September 2014 between 8.30 pm on Friday evenings until 8.30 pm on Sunday evenings and Public Holidays a portion of Chesterfield Avenue, from the Phoenix Monument Roundabout to the Mountjoy Roundabout only, will be closed to vehicles.

During these periods an alternative route, using Odd Lamp Road, will be opened. The OPW will monitor traffic flows in order to minimise disturbance to users of the Park.

Thursday, May 1, 2014

Giro D’Italia Road Race Event

It's one of the biggest sporting events in Europe and it is coming to Ireland and most importantly for us in Live Drive it is coming to Dublin. 

Of course there will be a number of roads closed to facilitate the race and a number of rolling closures as it makes it's way into town.

Road Closures:

Location 1: Merrion Square South from 20.00hrs on Thursday 8th May 2014 to 23.00hrs on Sunday 11th May 2014.

Location 2: Merrion Square West, Merrion Square East, Merrion Street Upper, Fitzwilliam Street Lower and Mount Street Upper from 20.00hrs on Friday 9th to 23.00hes on Sunday 11th May 2014. 


Location 3: Howth Road (from Kilbarrack Road to James Larkin Road), James Larkin Road, Clontarf Road, Alfie Byrne Road, East Wall Road, North Wall Quay, Custom House Quay, City Quay, Lombard Street, Westland Row, Lincoln Place, Merrion Street Lower, Clare Street, Leinster Street South, Merrion Square North from 13.30hrs to 17.00hrs on Sunday 11th May 2014.


Traffic Management Plan
The main event will take place on Sunday afternoon 11th May. However, there will be temporary road closures in on Merrion Square area (to prepare the Finish Line), starting on Merrion Square South on Thursday night 8th May and then extending to Merrion Square East & West etc on Friday night 9th May, during which the following diversions will be in operation

Traffic from Clare Street & Merrion Street Lower wishing to travel on Merrion Square West to Baggot St Lower will be diverted via Merrion Square North, Mount St Lower, Warrington Place and Herbert Place.

Traffic on Merrion Square North & Holles St wishing to travel on Merrion Square East & Fitzwilliam St Lower to Fitzwilliam St Upper will be diverted via Mount St Lower, Warrington Place, Herbert Place and Baggot Street Lower.

Traffic on Fitzwilliam St Upper wishing to travel on Fitzwilliam St Lower & Merrion Square East to Holles St & Merrion Square North will be diverted via Baggot Street Lower, Herbert Place, Warrington St and Mount St Lower.

Traffic on Merrion Row wishing to travel on Merrion St Upper & Merrion Square West to Merrion Square North will be diverted via Baggot St Lower, Herbert Place, Warrington St and Mount St Lower.

Rolling Road Closures:

On Sunday afternoon 11th May, for the race, there will be road closures along the coast route on Howth Road, from Kilbarrack Rd, onto James Larkin Rd, Clontarf Road, Alfie Byrne Road, East Wall Rd, North Wall Quay, Custom House Quay, Talbot Memorial Bridge, City Quay, Lombard Street, Westland Row, Merrion St Lower, all Merrion Square, and adjoining roads from 13.30 hrs. However, temporary vehicular crossing points will be maintained at the following junctions: James Larkin Rd / Causway road, East Rd / Merchants Road / East Wall Rd, Guild St / Samuel Beckett Bridge, Memorial Rd / Custom House / Talbot Memorial Bridge and Lombard St / Townsend St / Pearse St, until approx 20 minutes before the race approaches.

Pedestrian access will be maintained.

Friday, April 18, 2014

1916 Commemoration Closures

O'Connell Street upper and lower will close from Parnell St to Bachelors Walk this Sunday (20th of April) from 5 am to 3 pm. 

Diversions:

Traffic on Bachelors Walk and O’Connell Bridge wishing to access Parnell Street will be diverted via Eden Quay, Beresford Place, Gardiner Street Lower and Parnell Street.

Traffic on Parnell Square East wishing to access D’Olier Street will be diverted via Parnell Street, Marlborough Street, Sean MacDermott Street Upper, Gardiner Street Lower, Beresford Place, Memorial Road, Georges Quay and Burgh Quay.

Traffic on Sean MacDermott Street Upper wishing to access D’Olier Street via Cathal Brugha Street and O’Connell Street will be diverted via Marlborough Street, Eden Quay, Beresford Place, Memorial Road, Georges Quay and Burgh Quay.

Pedestrian and local access will be maintained.

Wednesday, March 5, 2014

Closure of North Wall Quay Thursday and Friday

The European Peoples Conference will be rolling into town on Thursday and Friday, it will see 1,500 delegates, 16 heads of government, 600 Journalists, 73 member parties from 40 different countries, 13 members of the European commission and Angela Merkel.

Throw in a protest on Thursday evening from round 6 and you know you've got all the elements for some traffic disruptions in the city centre.

The whole thing takes place in the national Convention centre

On Thursday the 6th March a traffic management plan including local traffic restrictions will be put in place at the front and rear of the Convention Centre Dublin (CCD) on North Wall Quay. 

A number of "lay-bys” will be created outside the CCD to facilitate the arrival of 1500 delegates & the media arriving at the venue. At this time traffic flows will be maintained if possible in all directions on North Wall Quay.

At 6:30pm approximately on Thursday the traffic management plan will begin to restrict the movement of traffic in front of the CCD. North Wall Quay will close between Guild Street and East Wall Road at the O2. A number of additional local temporary diversions will also be put in place to facilitate the arrival of VIPs.

It should be borne in mind that pedestrian restrictions from approaching the CCD will be in place so residents / employees should have a form of ID to ease access to their place of employment & residences.

Friday the 7th March

Friday is a normal business day and Gardaí do not anticipate any significant issues in this regard. A small number of road closures local traffic restrictions will be in place around the convention centre. Public transport in the areas will run as normal.

On Friday the 7th March the traffic management plan will again be implemented from early morning to early afternoon and will restrict the movement of traffic in front of the CCD. North Wall Quay will close between Guild Street and East Wall Road. A number of additional local temporary diversions will also be put in place to facilitate the arrival of VIPs.

Vehicles accessing the CCD, Spencer Dock & PWC Complexes will be allowed local access via the O2 Direction & Guild Street / Mayor St. Drivers to have ID in their possession.

Pedestrians are urged to utilise the same routes.

Diversions:

· When traffic is restricted at North Wall Quay from the O2 to Guild Street / Samuel Becket Bridge, general traffic east/west will be diverted via Sheriff Street.

· VMS Signage will be utilised at diversion points

· LOCAL ACCESS will as far as possible be allowed during the event / Any associated protests

· On Thursday / Friday the travelling public are urged to utilise public transport as far as possible to the IFSC & North Wall.

· Persons working in the vicinity of the CCD are requested to carry some form of Identification to ease access through Garda Barriers.

· Traffic Diversions will only be put in place when necessary and lifted as soon as possible.

Live feeds to FB & Twitter will be updated as soon as traffic situation changes.

Gardai will be on duty at relevant locations so as road closures can be implemented/lifted at short notice.

Thursday, February 20, 2014

Operation Transformation Fun Run

There's an “Operation Transformation Fun Run” in the Phoenix Park this Saturday and there will be a few road closures as a result.

Chesterfield Avenue {Mountjoy to the Phoenix} 7.30 am - 1.00 pm
Ordnance Survey Road 9.00 am - 1.00 pm
Chapelizod Gate (no left turn) 9.00 – 1.00 pm
Glen/Upper Glen Road 9.00 am - 1.00 pm
Fury Glen 9.00 am - 1.00 pm

Gates to be closed

Knockmaroon Gate – until 1pm
Ashtown Gate (no right turn) 9.00 – 1.00 pm
Castleknock Gate 9.45 – 1.00 pm
Parking only permitted in areas agreed with organisers

Thursday, January 30, 2014

Road Closures in Skerries this Weekend.

Fingal County Council will temporarily close a number of roads in the Skerries area for the purpose of holding a duathlon race.

The roads will be closed from 10.30am to 12.30 p.m on Saturday 1st February 2014.

The roads in question are:-

Portion of the Blackhills to Balcunnin Road from Adrgillan Entrance to St. Monica’s Road.
St. Monica’s Road from the Blackhills to Balcunnin Road to Kearney’s Tree.
Portion of the Killalane Road from Kearney’s Tree to Man O War Corner.
Portion of the Knock Cross to Palmerston Road from approximately halfway between
Kennedy’s Corner and the Man O’ War Corner to the Balrothery- Courtlough Road .
Portion of the Balrothery- Courtlough Road to The New Lane Road.
The New Lane Road.
Portion of the Killalane Road from The New Lane Road to the Cross of the Cage Barnageera Road.
Portion of The Cross of the Cage Road to Barnageera Road from the The Cross of the Cage  to Ardgillan Entrance.

Alternative routes available as follows:

Access to Ardgillan Castle will be via the R127 Balbriggan-Skerries Road and Barnageera Road.
Access to Balrothery will be via the R127 Balbriggan-Skerries and the R132.
Access to Courtlough will be via the R132.

Local Access will be facilitated where possible and diversion signage and marshals will be in place for the duration of the closure

Friday, January 24, 2014

Beckett Bridge Closure Dates

Essential maintenance works are scheduled to be carried out on the Samuel Beckett Bridge in the coming months. In order to facilitate these maintenance works it will be necessary to close the bridge to both pedestrian and vehicular traffic at night-time. 

The first stage of the maintenance works will be completed between the 27th of January and the 3rd of February, during this period night-time bridge closures will be in place from 9 PM and 6 AM.

The following is a comprehensive list of the times and dates when the bridge will be closed:

Monday 27th January 2014 21:00 hours until Tuesday 28th January 2014 06:00 hours.

Tuesday 28th January 2014 21:00 hours until Wednesday 29th January 2014 06:00 hours.

Wednesday 29th January 2014 21:00 hours until Thursday 30th January 2014 06:00 hours.
Thursday 30th January 2014 21:00 hours until Friday 31st January 2014 06:00 hours.

Friday 31st January 2014 21:00 hours until Saturday 1st February 2014 06:00 hours.

Saturday 1st February 2014 21:00 hours until Sunday 2nd February 2014 06:00 hours.

Sunday 2nd February 2014 21:00 hours until Monday 3rd February 2014 06:00 hours.

Additional closures will be required during the coming months in order to complete the maintenance works, the times and dates of these additional closures will be issued by email as soon as they have been finalised.